| MOQ: | 3000 sets |
| Price: | $25,500.00 - $32,000.00/sets |
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
| Company’s Name:ShangHai Long shou machinery company Limited |
| Address: No 1688 South Lian Hua Road, MinHang district.ShangHai, P. R. China |
| Contact :Olivia.He |
| Whats app/ Mobile phone:+8618701954897 |
| We chat number:18701954897 |
|
|
| Parameter Configuration of Sany Heavy Industry SY135C Excavator |
| specifications |
| Power Traditional Power |
| Domestic production by manufacturers |
| Bucket Backhoe |
| Tonnage (ton) 13 |
| Working weight of the whole machine (kg) 13500 |
| Bucket capacity (m ³) 0.22-0.7 (0.6) |
| performance |
| Rotation speed (rpm) 12 |
| Walking speed (km/h) 5.5/3.5 |
| Climbing ability (%) 70% (35 °) |
| Ground specific voltage (Kpa) 41.7 |
| Bucket excavation force (kN) 92.7 |
| Dipper arm excavation force (kN) 66.13 |
| dynamic system |
| Engine model Isuzu 4JJ1-XDJAG-01-C3 |
| Rated power (kW/rpm) 73/2000 |
| Maximum torque (N.m) 365/1600 |
| Displacement (L) 2.999 |
| Cooling method: water cooling |
| Oil capacity |
| Fuel tank (L) 240 |
| Hydraulic oil tank (L) 150 |
| Engine oil change quantity (L) 15 |
| Main body size |
| Total length of transportation (mm) 7700 |
| Total transportation width (mm) 2550 |
| Total transportation height (mm) 2815 |
| Full height of cab (mm) 2740 |
| Boarding width (mm) 2490 |
| Track grounding length (mm) 2930 |
| Total length of track (mm) 3665 |
| Track shoe width (mm) 500 |
| Track gauge (mm) 1990 |
| Minimum ground clearance (mm) 425 |
| Minimum turning radius of the front working device (mm) 2500 |
| Rear end turning radius (mm) 2240 |
| Maximum height at minimum turning radius (mm) 6500 |
| Number of carrier rollers (one side) (piece) 1 |
| Number of track shoes (one side) (pieces) 44 |
| Number of supporting wheels (one side) (number) 7 |
| Scope of work |
| Maximum excavation radius (mm) 8290 |
| Maximum excavation depth (mm) 5510 |
| Maximum excavation height (mm) 8685 |
| Maximum unloading height (mm) 6180 |
| Maximum vertical excavation depth (mm) 4890 |
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
![]()
![]()
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
![]()
![]()
![]()
Method 3 use 40FR Frame
![]()
![]()
![]()
Method 4 use 40HQ container ,cheapest but destroy machine
| MOQ: | 3000 sets |
| Price: | $25,500.00 - $32,000.00/sets |
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
| Company’s Name:ShangHai Long shou machinery company Limited |
| Address: No 1688 South Lian Hua Road, MinHang district.ShangHai, P. R. China |
| Contact :Olivia.He |
| Whats app/ Mobile phone:+8618701954897 |
| We chat number:18701954897 |
|
|
| Parameter Configuration of Sany Heavy Industry SY135C Excavator |
| specifications |
| Power Traditional Power |
| Domestic production by manufacturers |
| Bucket Backhoe |
| Tonnage (ton) 13 |
| Working weight of the whole machine (kg) 13500 |
| Bucket capacity (m ³) 0.22-0.7 (0.6) |
| performance |
| Rotation speed (rpm) 12 |
| Walking speed (km/h) 5.5/3.5 |
| Climbing ability (%) 70% (35 °) |
| Ground specific voltage (Kpa) 41.7 |
| Bucket excavation force (kN) 92.7 |
| Dipper arm excavation force (kN) 66.13 |
| dynamic system |
| Engine model Isuzu 4JJ1-XDJAG-01-C3 |
| Rated power (kW/rpm) 73/2000 |
| Maximum torque (N.m) 365/1600 |
| Displacement (L) 2.999 |
| Cooling method: water cooling |
| Oil capacity |
| Fuel tank (L) 240 |
| Hydraulic oil tank (L) 150 |
| Engine oil change quantity (L) 15 |
| Main body size |
| Total length of transportation (mm) 7700 |
| Total transportation width (mm) 2550 |
| Total transportation height (mm) 2815 |
| Full height of cab (mm) 2740 |
| Boarding width (mm) 2490 |
| Track grounding length (mm) 2930 |
| Total length of track (mm) 3665 |
| Track shoe width (mm) 500 |
| Track gauge (mm) 1990 |
| Minimum ground clearance (mm) 425 |
| Minimum turning radius of the front working device (mm) 2500 |
| Rear end turning radius (mm) 2240 |
| Maximum height at minimum turning radius (mm) 6500 |
| Number of carrier rollers (one side) (piece) 1 |
| Number of track shoes (one side) (pieces) 44 |
| Number of supporting wheels (one side) (number) 7 |
| Scope of work |
| Maximum excavation radius (mm) 8290 |
| Maximum excavation depth (mm) 5510 |
| Maximum excavation height (mm) 8685 |
| Maximum unloading height (mm) 6180 |
| Maximum vertical excavation depth (mm) 4890 |
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
![]()
![]()
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
![]()
![]()
![]()
Method 3 use 40FR Frame
![]()
![]()
![]()
Method 4 use 40HQ container ,cheapest but destroy machine